Machined housing RFQ: make the finished interfaces clear JK Casting | https://www.jkcasting.com/resources/machined-housing-rfq/ Editable procurement worksheet | 14 September 2026 Fill known facts. Mark unknown items as TO BE CONFIRMED. This worksheet does not approve a design, promise a price or authorise production. If a 3D model cannot be supplied 3D model status: AVAILABLE / UNAVAILABLE Unreadable or undefined drawing features (sheet / view / feature): Quoted delivery stage and responsibility for later welding, assembly or machining: Model preparation, if needed: responsible party / drawing revision / assumptions to review / quoted cost: 1. Finished-part drawing revision; model and casting drawing revisions where available: Response: Evidence / file revision: Open question / owner: 2. Controlling document and unresolved conflicts: Response: Evidence / file revision: Open question / owner: 3. Bore / shoulder / mating face / hole pattern: feature and datum references: Response: Evidence / file revision: Open question / owner: 4. Raw / partly machined / finished condition; inserts and mating hardware included or excluded: Response: Evidence / file revision: Open question / owner: 5. Material specification and required records: Response: Evidence / file revision: Open question / owner: 6. Feature-level inspection: drawing reference, sample ID, result and acceptance basis: Response: Evidence / file revision: Open question / owner: 7. Part numbers, quantities, variants and non-binding annual forecast: Response: Evidence / file revision: Open question / owner: 8. Tooling ownership requirements and delivery destination: Response: Evidence / file revision: Open question / owner: Send authorised project files to kai@jkcasting.com or https://www.jkcasting.com/contact/ Business contact: Kai Gao | +8613156921608